Shropshire Energy

May 2012

  • Plant nears completion

    Plant nears completion

  • Precast concrete roof installation

    Precast concrete roof installation

  • Service box fixed to inner tank wall

    Service box fixed to inner tank wall

  • Large openings formed in tank walls to accommodate Auger feeders

    Large openings formed in tank walls to accommodate Auger feeders

The project consisted of:-

  • 2 No. 20m diameter 8.0m tall Primary Digesters
  • 2 No. 26m diameter 8.0m tall Secondary Digester
  • 1 No. 32m diameter 8.0m tall Digestate Storage Tank

The Primary digesters were fitted with A-Consult's own design Gas-Tight precast concrete, pre-insulated roof units.

Book a Site Visit

Why not book a visit to one of our sites to see first hand the process of building one of our water storage solution systems. Click below to sign up.

Book a site visit

Testimonials

  • The robust construction of the Agri-Tank allows the structure to be back filled, which in turn enabled us to locate both of our tanks at optimum locations on the farm.

    Hugh McClymont

    Farm Manager, Scottish Agricultural College

  • This was a very complex job consisting of an Outer Digester, Inner Digester, Gas tight precast concrete roof and a Storage Tank.

    S W Gittins

    Oswestry

  • A large scale on farm AD facility.

    Shropshire Energy

    Littleport - Cambridgeshire

Read More