Burton Agnus AD Facility

  • Fully Lined Digestate Storage Tank - before membrane roof installation

    Fully Lined Digestate Storage Tank - before membrane roof installation

  • Digester with partially installed concrete roof

    Digester with partially installed concrete roof

Book a Site Visit

Why not book a visit to one of our sites to see first hand the process of building one of our water storage solution systems. Click below to sign up.

Book a site visit

Testimonials

  • The robust construction of the Agri-Tank allows the structure to be back filled, which in turn enabled us to locate both of our tanks at optimum locations on the farm.

    Hugh McClymont

    Farm Manager, Scottish Agricultural College

  • This was a very complex job consisting of an Outer Digester, Inner Digester, Gas tight precast concrete roof and a Storage Tank.

    S W Gittins

    Oswestry

  • A large scale on farm AD facility.

    Shropshire Energy

    Littleport - Cambridgeshire

Read More